മലയാളം

RE TENDER-Replacing roofing sheet and frame in the godown space - C l402 and above shop D1104 at JNIS,kaloor - E2/6255/2014/GCDA

RE TENDERS-Maintenance work of office a quarters for the yeat 2026-2027 - E5/11336/2025/GCDA

RE TENDERS-Leakage arresting 3rd and 4th row of shops at JNI Stadium - 3243/E2/2025GCDA

RE TENDERS-Open Technology Design Engineering procurement Construction Erection Commissioning - E1/1767/2025/GCDA

TENDERS-EXPRESSION OF INTEREST - E3/2922/2025GCDA

RE TENDERS-Replaced damaged tiels walkway at marindrive - E3/9653/2025/GCDA

project

GCDA Switching over to Solar Energy


The solar power station catering 50% of GCDA's power needs has been inaugurated by Justice Krishna Aiyyar on 9.10.2013. The solar energy generated feeds the power requirement of two of the four floors of GCDA office. This 60kvA PowerStation contains 144nos of polycrystalline solar panel, 60kvA power conditioning unit with 3phase output and the connected components. The cost of the project is 42.90 lakhs excluding 30% subsidy from NMRE. This power station was installed by UNITED ELECTRICAL INDUSTRIES, KOLLAM, a state Govt. company, selected by GCDA through tendering process. The solar panels are also having a warranty of 25 years

Other

Projects

View Other Projects

Latest update

Our Latest News

View all news